50 Years of Know-How and Art 
   INFRASTRUCTURES AND URBANISM
CASAIS ENGINEERING PORTFOLIO
  

IFB 139

Building Level Energy and Water Saving Works
Completion deadline: 12 months.
Owner
Cheropovets Mager Office
Site
Cherepovets


Connection Road between Macinhata and Serém

Bridge over the river Vouga, which connects Macinhata to Serem, comprising a prefabricated flooring system.
Set upon pillars founded at the riverbed, it implied the use of bulkhead gates on the basis of the bridge' support.
Owner
Câmara Municipal de Águeda
Site
Macinhata - Serém, Águeda


Pechora Pipe Line Construction

Pechora Pipe Line Construction.
Completion deadline: 12 months.
Owner
Pechoravodokanal
Site
Pechora


Bridges and Flyovers of Cabeceiras de Bastos

A work of high complexity due to the curved shape and the river's crossing by the central span.
Owner:
Cabeceiras de Basto Town-Hall
Site:
Cabeceiras de Basto