Water storage elevated tank for the Hotel Monte Prado Sports and Leisure Complex
Owner Câmara Municipal de Melgaço Site Monte Prado, Melgaço
|
| |
|
|
|
Water Collection Wells of Hammadi
The contract works consisted in the construction of two collection wells and a dam, with the capacity of 1m3/s, for the feed of drinking water of Oujda and Taourit, which is released from the dam of Machraâ Hammadi. Owner ONEP - Office Général d´Eau Site Oujda
|
| |
|
|
|
|
Wastewater Treatment Plant HALLE-NORD
The large WWTP(ETAR) will serve a population of 500 thousand inhabitants. This work was accomplished in 8 months. The construction of the tanks and the entrance tower, executed in a moving formwork, must be enhanced. Site Halle/Salle Owner Schuppert Bau GmbH
|
| |
|
|
|
Wastewater treatment plant of Murça
Project preparation stage and execution of the wastewater treatment plant of Murça. This wastewater treatment plant will guarantee a secondary level treatment and has a capacity for 2850 inhabitants-equivalent. Owner Águas de Trás-os-Montes e Alto Douro, S.A. Site Murça
|
| |
|
|
|
|
Wastewater Treatment Plant of Alijó, Murça, Sabrosa and Sanfins do Douro
Project Design and execution of the Wastewater Treatment Plant of Alijó, Murça, Sabrosa and Sanfins do Douro. The Wastewater Treatment Plant will assure a secondary treatment level with a capacity for 6.850, 3.850, 2.750 and 3.100 inhabitants. Owner Águas de Trás-os-Montes e Alto Douro, S.A. Site Alijó, Murça, Sabrosa, Sanfins do Douro
|
| |
|
|
|
|