Clos Folon
Casais Belgium recently started the construction of a luxurious Residential venture in Ukkle.
The project is composed by three blocks, made up by two underground floors and by three habitable floors. With a construction area of around 15.000m2, the venture will have a total of one hundred apartments and its conclusion is planned for October of 2009.
Owner: Brussels Projects - Residential Investments/STRABAG
Site: Ukkle
|
| |
|
|
|
North Light and Pole Star
The North Pole and Pole Star Towers will accept 3500 workers from Fortis and will be built on some of the latest construction land available in the center of Brussels, very close to the main train station "Gare du Nord". Each of the towers will have an area of 35.474m² and their height will be 62m.
Owner: Fortis
Site: Brussels
|
| |
|
|
|
|
Campus Kantienberg
Construction of a University Campus with a construction area of 20.000m², with capacity for 3000 students and 500 employees. The building is made up of a tower 30m tall, laboratories, mediate, library, cafeteria and canteen.
Owner: Arteveldehogeschool vzw
Site: Gent
|
| |
|
|
|
Museum Hergé
The Hergé Museum is the most recent workmanship of the Casais - Belgium in course. With a total surface of 3600 m², the cultural infrastructure conceived by the french Architect Christian de Portzamparc, will reunite the temporary and permanent collections (on the subjects "A man of art", "The worlds of Tintin" and "A 20th century classic"). The foreseen Museum to the public that will open on the first semester of 2009 will also have a bookstore - store, a coffee shop, dressing rooms and technical spaces. The architecture of the building is characterized for inclined walls, generous spaces and a complex geometry.
Owner
Fanny Rodwell (Hergé's widow)
Site
Louvain-La-Neuve
|
| |
|
|
|
|
Stora Enso
This work is an enlargement of a large paper mill characterized for the high quality and safety standards. Owner Stora Enso / JV Franki Construct-Strabag NV Site Gent
|
| |
|
|
|
Lurgi-Sleco Antwerpen
Co-Incinerator Large industrial building in reinforced concrete characterized for the wide Bunkers, with 50m of height and built in a short period of time through the use of a moving formwork system. Owner Lurgi-Sleco / JV Franki Construct-Strabag NV Site Antuérpia
|
| |
|
|
|
|
GSK Biologicals
Pharmaceutical laboratory. Large building constructed with the latest technology and built with prefabricated solid elements, which shortened the construction deadlines. Owner Glaxosmithklein - JV BKV Site Wavre
|
| |
|
|
|
City Center
A large-scale work in the centre of the cosmopolitan city of Brussels characterized for the maintenance of the ancient façade of the extinct market "Bom Marché" and the complex logistics of a work in an extremely congested urban centre. Shopping Centre + 8 Floor of Offices + 2 floors of underground park. Owner Fortis Bank / Hochtief Belgium Site Brussels
|
| |
|
|
|
|
Charlemagne
This project consisted on the construction of a complete block of houses for the university city of Louvain La Neuve. Owner BPC Site Louvain La Neuve
|
| |
|
|
|